STEEL STORE

1.0C

1.0 C

NOTE: 1.0 C form deck provides a strong, secure, stay in-place form for poured concrete applications. Installation is fast, easy and economical. 1.0 C form deck is designed to serve as a permanent steel base for poured reinforced concrete floor slabs. Structurally, 1.0 C form deck provides a strong efficient section for forming slabs, while giving lateral stability to structural members.

Lead Time: 3 Weeks (Based on Material Availability)

Click here to view the Part Manual Page (PDF)

Order Item

- - -

Punching Special Type:

Standard Punches = 9/16" x 1" Slot
Keyhole Punches = 3/16" x 2 1/4"
Loading...